Wednesday, December 1, 2010
Rain
It started raining Mon. around 2pm and did not stop until Tue. night. We are trying to remove all the water we can from the slab area. 
Monday, November 29, 2010
13yrds of concrete poured today.
Tuesday, November 23, 2010
Friday, November 19, 2010
B Footings
Wednesday, November 17, 2010
3" of Rain
We received over 3" of rain on the job site between Sunday night and mid-day Tuesday.
While we are waiting for things to dry out we are tying rebar for footers.
Tuesday afternoon we dewatered the slab and footers the best we could with a 2" pump. Today we are pumping out the last bit of standing water with a smaller utility pump.
While we are waiting for things to dry out we are tying rebar for footers.
Monday, November 15, 2010
Rain
Past 24-hr:Precip: 1.06 in (est.)
Rain showers this evening, becoming a steady, soaking rain overnight with a few rumbles of thunder possible. Low 54F. Winds ESE at 5 to 10 mph. Additional rainfall possibly over one inch.
Rain showers this evening, becoming a steady, soaking rain overnight with a few rumbles of thunder possible. Low 54F. Winds ESE at 5 to 10 mph. Additional rainfall possibly over one inch.
Subscribe to:
Posts (Atom)